42 Bilder zum Thema "construction site water solutions" bei ClipDealer

Medien sortieren nach     Gehe zu Seite:    
« Vorherige  1  Nächste »
Build eco friendly underground rainwater solutions provides harvesting stormwater system around commercial area
Constructing road on well prepared concrete base during laying of stormwater drainage system that will be installed
In underground trench, drainage pipes are laid assembled to channel rainwater stormwater out of trench
On construction site, worker digs trench to lay perforated pipe as part of drainage system.
At construction site, worker digs trench for laying drainage system perforated pipe underground.
Putting in place drainage pipes for outflow of rainwater stormwater underground
Installation of plastic black pipes is required for flow of rainwater to main collector
Before installing concrete drainage wells on construction site, concrete drainage wells are stacked
Using wheelbarrow, worker fills over drainage pipes with crushed stone
Stack of concrete drainage wells for water discharge in aconstruction site prior to their installation
Installation black plastic pipes to facilitate flow of rainwater to main collector
Water flow will be routed through plastic black pipes to rainwater collection system
Underground mounting of drainage pipes for outflowing rainwater stormwater
At construction site, worker digs trench for underground installation of drainage system using perforated pipes.
Stack of concrete drainage wells for water discharges in construction site before installing wells
Providing flow of rainwater to main collection system by installing plastic black pipes
Engineers are devising plan for laying a drainage pipe for rainwater in retaining wall.
Plastic black pipe is installed in order to allow rainwater to flow to main collector
Installation of plastic black pipes for draining rainwater to central collector
Concrete drainage wells for water discharge on construction site before they are installed
Installation of plastic black pipes for flow of rainwater to main collector
On construction site, worker digs trench to lay perforated pipe for drainage system.
Stack of concrete drainage wells for discharge of water on construction site
Stacking of concrete drainage wells for discharge of water in construction site prior to their installation
Installation of plastic black pipes for flow of rainwater to rainwater collection system
Worker digs trench for laying drainage system perforated pipe underground at construction site.
Stack of concrete drainage wells prior to installation on construction site
On construction site, worker digs trench for installation of drainage system containing perforated pipes.
Flow of rainwater to main collector is provided by installation of plastic black pipes
Flowing rainwater into main collecting container using plastic black pipes
At construction site, worker digs trench to lay drainage system that consists of perforated pipes underground.
Construction site drainage wells stacked before installation
Stack of concrete drainage wells for water discharge prior to installation on construction site
Foundation waterproofing with membrane solution. Concrete waterproofing membrane for underground basement walls.
Retaining wall structure : Engineering structures
Retaining wall structure : Engineering structures
Waterproofing and insulation unfinished house foundation wall.
Roller brush waterproofing
Roller brush waterproofing
Storm water drainage trays were constructed as drainage canals before roads were constructed.
Concrete ditch trays were used to drain storm water as drainage canals prior to construction of roads
Prior to construction of roads, concrete ditch trays were used as drainage canals for storm water

« Vorherige  1  Nächste »