4 Bilder zum Thema "Construction site crane inspections" bei ClipDealer

Medien sortieren nach     Gehe zu Seite:    
« Vorherige  1  Nächste »
Seismic test on concrete pile. Engineer using the PIT Hand-Held Hammer, the PIT Accelerometer and the Pile Integrity Tester to detect Neck Bulge and Void in the piles
The operator operated the tower crane at the construction site to create the building and condominiums. and sunshine in midday.
In recent years, tower cranes have emerged as a valuable tool for building bridges at construction sites. With their ability to lift and move heavy loads quickly and efficiently.
install a tower crane at the construction site by using a mobile crane for lifting and assembly.

« Vorherige  1  Nächste »